A pre-production inspection checks materials, components, tooling, approved samples and production readiness before the main manufacturing run starts.
How the control works
Use it when incorrect inputs would make later inspection too late or expensive. The inspector should verify that controlled specifications and samples are available at the line.
| Area | What the record should show |
|---|---|
| Control | Use it when incorrect inputs would make later inspection too late or expensive. The inspector should verify that controlled specifications and samples are available at the line. |
| Evidence | Retain material identities, quantities, certificates, tooling condition, line setup, approved sample, open issues and start authorization. |
| Tradeoff | A readiness visit should not be reported as a finished-goods inspection. It confirms inputs and preparation, not completed output. |
Evidence buyers should retain
Retain material identities, quantities, certificates, tooling condition, line setup, approved sample, open issues and start authorization.
Where the term is misused
A readiness visit should not be reported as a finished-goods inspection. It confirms inputs and preparation, not completed output.
Related definitions: supplier qualification, strategic sourcing, landed cost.