A pilot production run is a limited build completed with intended production equipment and processes before full-volume release. It tests repeatability, yield, quality controls and the production handoff.
| Area | What to record |
|---|---|
| Decision | Set entry criteria, quantity, inspection plan and acceptance thresholds. Treat defects and process changes as learning that must be closed before scale-up. |
| Evidence | Capture inputs, equipment, operators or shifts where relevant, output, yield, cycle time, defects, corrective actions and release decision. |
| Watch point | A pilot that uses special supervision or selected materials may overstate normal performance. Record every exceptional condition. |
When the term matters
Set entry criteria, quantity, inspection plan and acceptance thresholds. Treat defects and process changes as learning that must be closed before scale-up.
Checks before approval
Capture inputs, equipment, operators or shifts where relevant, output, yield, cycle time, defects, corrective actions and release decision.
A pilot that uses special supervision or selected materials may overstate normal performance. Record every exceptional condition.

